Customization: | Available |
---|---|
Color: | White/Black |
Application: | Retaining Wall, Steep Slop, Dam, Road Base |
Still deciding? Get samples of US$ 0/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Application:
Typical Applications include:
Highways: vertical edge-of-carriageway drains intercept the lateral flow of ground water. Modern fin drains reduce excavation, reduce backfill quantities and reduce installation time. In-slope drainage increases geotechnical stability.
Retaining walls and bridge abutments: to reduce pore water pressure and avoid backfill saturation.
Engineered landfills: with the additional requirement of long-term chemical resistance and high compressive strength.
Tunnels: ground-water-seepage interception between rock face and the tunnel lining.
Buried structures: vertical and horizontal drains for basements, culverts, car parks, reservoirs, etc.
Features:
Net drainage geocomposites are manufactured using a unique geotextile filter developed specifically for use in drainage geocomposites for its high tensile modulus and ability to prevent soil ingress into the void space of the drainage core.
The drainage cores are manufactured from HDPE nets which have been engineered to have good flow under high loading.
Package information:
1. Roll size: 2m*30/50m or 3.9*30/50m
2. The outer package: black or white woven geotextile.
3. Different thickness/ roll size for different qty in the same containers. so if you have any questions, please contact us.
Quality assurance
After-sales service
1.In order to provide customers with comprehensive technical support,we will provide technical and other related information upon request in a timely manner.
2.In required,we will appoint specialized technicians to the construction site to give technical trainings to construction people,and offer technical guidance throughout the whole construction process.
3.For damage due to shipment and delivery,after we receive the complaint,we will check the issure through provided pictures and videos.If our responsibility is confirmed,we wil offer free replacement.
4.When the construction is completed,as your request,our technical staff may participate in the final acceptance.